Intuitive Machines announced that it has set a new launch time for the IM-1 Moon mission. The launch, coordinated with SpaceX, is aimed to be carried out within a few days, not before mid-February 2024.
Intuitive Machines 宣布为 IM-1 月球任务设定了新的发射时间。这次发射是与 SpaceX 协调的,目标是在几天内进行,而不是在 2024 年 2 月中旬之前。
The update came after unfavorable weather conditions led to changes to the SpaceX launch manifest.
此次更新是在不利的天气条件导致 SpaceX 发射清单发生变化之后发布的。
Interestingly, the mission would also include DOGE-1, a CubeSat mission planned by Geometric Energy Corporation. The mission's expenses will be covered entirely with Dogecoin. The launch of DOGE-1 was announced by Elon Musk on Twitter on May 9, 2021, as a joint rideshare on the Nova-C/IM-1 mission, a joint mission between Intuitive Machines and NASA.
有趣的是,该任务还将包括几何能源公司计划的 DOGE-1 立方体卫星任务。该任务的费用将完全由狗狗币支付。埃隆·马斯克 (Elon Musk) 于 2021 年 5 月 9 日在 Twitter 上宣布推出 DOGE-1,作为 Intuitive Machines 和 NASA 联合任务 Nova-C/IM-1 任务的联合乘车服务。
Related News: Shiba Inu (SHIB) Developers Introduce the Next Big Thing: Lead Developer Shytoshi Kusama Makes a Statement
相关新闻: Shiba Inu (SHIB) 开发者介绍下一件大事:首席开发者 Shytoshi Kusama 发表声明
In the previous plan, the mission was expected to be launched in the last quarter of 2023.
在此前的计划中,该任务预计于2023年最后一个季度发射。
The launch window in mid-February represents the next available opportunity for the launch of IM-1, given the Moon's monthly dark period. The IM-1 mission's Nova-C Lunar rover will land near the Moon's south pole, requiring special lighting conditions that are only available for a few days each month.
考虑到月球每月的黑暗期,二月中旬的发射窗口代表了 IM-1 的下一个发射机会。 IM-1 任务的 Nova-C 月球车将在月球南极附近着陆,需要特殊的照明条件,而每个月只有几天可用。
*This is not investment advice.
*这不是投资建议。
Continue Reading: JUST IN: Anticipated DOGE-1 Mission for Dogecoin Delayed Again
继续阅读:刚刚开始:预期的狗狗币 DOGE-1 任务再次推迟